Active

±740 ACRES, ±489,925 SF | FORMER PAPER MANUFACTURING FACILITY WITH INFRASTRUCTURE AND LAND FOR REDEVELOPMENT

4537 LA-480, Campti, LA 71411

1 / 13

Overview

Call for offers. Purchase proposals due by 5:00 PM, September 18, 2026.

REVITALIZING THE RED RIVER: WHERE INDUSTRY MEETS OPPORTUNITY.

The Red River Mill offers one of the most compelling industrial power and land site redevelopment sites in the I‑20 corridor. The former paper mill presents a large-scale redevelopment opportunity encompassing approximately ~764 acres and ~489,925 square feet of existing industrial improvements in Campti, Louisiana. Built for resource-intensive operations, the property combines substantial power, water, natural gas, rail, and waste-management infrastructure within a single established campus. Its utility platform includes 80 MW of grid power and 78.8 MW of on-site generation capacity, offering approximately 158.8 MW of historical combined power potential. Existing permits and infrastructure may significantly accelerate redevelopment compared with a typical greenfield site. With flexible potential for data center, advanced manufacturing, recycling, timber processing, or other heavy industrial uses, Red River Mill offers both near-term asset value and long-term development potential.

Key Highlights

  • ±764-acre industrial redevelopment site
  • ±489,925 SF of existing improvements
  • 80 MW of grid power delivered through twin 230 kV lines, with an executed interconnect agreement
  • 78.8 MW steam turbine with a Title V air permit in place
  • 2.65 miles from 500 kV transmission infrastructure, providing a path for future expansion
  • Direct 8-inch ENLINK natural gas pipeline
  • Permitted, transferable water intake and discharge rights
  • Rail-served 200,000 SF transload warehouse with rail spurs extending into the building
  • On-site wastewater treatment plant and landfill
  • Suitable for data centers, heavy manufacturing, recycling, timber processing, industrial park development, or scrap operations
  • Potential two-phase strategy combining scrap monetization with long-term redevelopment upside

Date Matrix

  • Site Visit Dates August 6, 11 & 13, 2026
  • Offer Packages Due Friday, September 18, 2026
  • Seller Response to Offers Thursday, October 8, 2026
  • Seller Finalizes Selection Thursday, October 29, 2026

Call for offers. Purchase proposals due by 5:00 PM (CST), September 18, 2026.

**ACCESS VIRTUAL DEAL ROOM THROUGH PROPERTY WEBSITE LINK. NON-DISCLOSURE AGREEMENT REQUIRED**

For Sale

Industrial
Other

Secondary Uses: Manufacturing, Industrial-Business Park, Warehouse/Distribution

Sale Price
$1
Building Size
489,925 SF
Office SF
10,256 SF
Warehouse SF
170,000 SF
Lot Size
764 ac
Is Vacant
Yes
Zoning
I-2
Zoning Desc.
Heavy Industrial
Former Tenant
International Paper
Call For Offers
Yes
Building Name
Red River Mill
Submarket
Natchitoches / Red River
Nearest MSA
Natchitoches Market
Property Use Type
Vacant/Owner-User
Property Status
Existing
Yard
Paved
Nearest Interstate
I-49 - 52 mi
Nearest Hwy
Highway 480
Nearest Airport
Alexandria International Aiprot - 61 mi
Nearest Port
Natchitoches Parish Port - 9.2 mi
Power Provider
Private - CLECO
Power
3 Phase
Gas Provider
Private - ENLINK
Rail Provider
CPKC
Rail Type
Rail Served
Rail Spur on Site
Yes
Parish
Natchitoches
Available
07/14/2026
Listed
07/14/2026
Updated
07/21/2026
Listing ID
231609a7